|
DRAFT PROGRAM LEVEL ENVIRONMENTAL IMPACT REPORT (EIR)
FOR WATER MASTER PLAN
The Draft Program EIR for the Water Master Plan is now available below for downloading and printing. Public comments will be heard as part of the March 27th, 2008 Board meeting. Written comments are due to the CCSD Admin office at 1316 Tamson Drive, Suite 201 or mailed to PO Box 65, Cambria 93428 by 5 pm on April 14th, 2008. If you have any questions on this document, or the public hearing, please contact CCSD Engineer Bob Gresens at 927-6119 or bgresens@cambriacsd.org.
EIR Cover Letter
Table of Contents
1.0 Introduction
2.0 Executive Summary
3.0 Project Description
4.0 Cumulative analysis
5. 0 Environmental Analysis
5.1 Land Use
5.2 Aesthetics
5.3 Traffic
5.4 Air Quality
5.5 Noise
5.6 Biological
5.7 Cultural
5.8 Geology
5.9 Hydrology
5.10 Public Health
5.11 Public Services/Utilities
5.12 Water Resources
5.13 Population/Housing
6.0 Alternatives
7.0 Effects Found
8.0 Mitigated Measures
9.0 Level of Significance
10.0 Organizations Consulted
11.0 Bibliography
12.0 Mitigated Monitoring
13.0 Comments/Responses
14.1 Appendices - Initial Study and NOP
14.2 Appendices - NOP Responses
14.3 Appendices - Buildout Reduction Info
WATER MASTER PLAN REPORT TASKS 3 AND 4
The Final DRAFT Water Master Plan reports on Task 3: Recycled Water Plan, Potable Water System Distribution Analysis and Task 4: Assessment of Long-Term Water Supply are now available below for viewing or downloading. To make it faster and easier to download, we have divided the reports into sections. They are all in PDF format and will require Acrobat Reader to open. Copies can also be viewed at the Cambria Library or the CCSD Administrative Office. You may also submit a Public Records Request by contacting the District Clerk at 927-6235 or email to kchoate@cambriacsd.org.
TASK 3: FINAL DRAFT RECYCLED WATER DISTRIBUTION SYSTEM PLAN
(Click on section you wish to view)
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Recycled Water Supply and Demand Projections
Section 3: Regulatory Requirements
Section 4: Treatment Processing
Section 5: Development of Recycled Water System
Section 6: Results of Recycled Water Systems Analyses
Section 7: Recommended Recycled Water System
Secton 8: Recommended Implementation Plan
Appendix A: ECS Irrigation System
Appendix B: Summary of Water Demand Data
Appendix C: Summary of Pipeline Sizes and Lengths
Appendix D: Model Results
Appendix E: Estimated Proposed Pipeline Costs
TASK 3: FINAL DRAFT POTABLE WATER SYSTEM DISTRIBUTION ANALYSIS
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Study Area and Existing Water System
Section 3: Water Demand Projections
Section 4: Development of Water System Model
Section 5: Results of Water System Analyses
Section 6: Recommmended Water System Improvements
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
TASK 4: FINAL DRAFT ASSESSMENT OF LONG-TERM WATER SUPPLY ALTERNATIVES
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Water Supply Requirements
Section 3: Water Quality Requirements
Section 4: Potable Water Supply Alternatives
Section 5: Seasonal Storage and Conjunctive Use Alternatives
Section 6: Overview of Relevant Treatment Technologies
Section 7: Evaluation Criteria for Water Supply Alternates
Secton 8: Detailed Evaluation of Selected Alternatives
Section 9: Recommended Plan
Appendices
back to top |