Final Program Level Environmental Report
The Final Program-Level EIR for the CCSD Water Master Plan is posted below in individual chapters. 
The EIR includes responses to all written comments received for public review in the Draft EIR.  This document was certified by the CCSD Board of Directors at the August 21, 2008 meeting.  Click here to review the August 21 Agenda/Staff Reports and August 21 Powerpoint Presentation.

Printed reports and CDs are available via a Public Records Request.  For additional questions, please contact Bob Gresens at 805-927-6223. 

Table of Contents
01 Introduction
02 Executive Summary
03 Project Description
04 Basis of Cumulative Analysis
05 Environmental Analysis
05.01 Land Use
05.02 Aesthetics
05.03 Traffic
05.04 Air Quality
05.05 Noise
05.06 Biological
05.07 Cultural
05.08 Geology
05.09 Hydrology
05.10 Public Health
O5.11 Public Service Utilities
05.12 Water Resources
05.13 Population Housing
06 Alternatives
07 Effects Found
08 Mitigation Measures
09 Level of Significance
10 Organizations Consulted
11 Bibliography
12 Mitigated Monitoring
13 Comments and Responses
Part 1
Part 2
14 Appendices
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
14.01 Initial Study and NOP
14.02 NOP Responses
14.03 Buildout Reduction

Task 3:  Final Draft Recycled Water Distribution System Plan
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Recycled Water Supply and Demand Projections
Section 3: Regulatory Requirements
Section 4: Treatment Processing
Section 5: Development of Recycled Water System
Section 6: Results of Recycled Water Systems Analyses
Section 7: Recommended Recycled Water System
Secton 8: Recommended Implementation Plan
Appendix A: ECS Irrigation System
Appendix B: Summary of Water Demand Data
Appendix C: Summary of Pipeline Sizes and Lengths
Appendix D: Model Results
Appendix E: Estimated Proposed Pipeline Costs

Task 3:  Final Draft Potable Water System Distribution Analysis
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Study Area and Existing Water System
Section 3: Water Demand Projections
Section 4: Development of Water System Model
Section 5: Results of Water System Analyses
Section 6: Recommmended Water System Improvements
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H

Task 4:  Final Report - Assessment of Long-Term Water Supply Alternatives
Table of Contents
Executive Summary
Section 1: Introduction
Section 2: Water Supply Requirements
Section 3: Water Quality Requirements
Section 4: Potable Water Supply Alternatives
Section 5: Seasonal Storage and Conjunctive Use Alternatives
Section 6: Overview of Relevant Treatment Technologies
Section 7: Evaluation Criteria for Water Supply Alternates
Section 8: Detailed Evaluation of Selected Alternatives
Section 9: Recommended Plan
Appendices