Skip to main content

Water Master Plan

The Final Program-Level EIR for the CCSD Water Master Plan is posted below in individual chapters.

The EIR includes responses to all written comments received for public review in the Draft EIR.  This document was certified by the CCSD Board of Directors at the August 21, 2008 meeting.

Table of ContentsSection 1: IntroductionSection 2: Executive SummarySection 3: Project DescriptionSection 4: Basis of Cumulative AnalysisSection 5: Environmental Analysis05.01 Land Use05.02 Aesthetics05.03 Traffic05.04 Air Quality05.05 Noise05.06 Biological05.07 Cultural05.08 Geology05.09 Hydrology05.10 Public HealthO5.11 Public Service Utilities05.12 Water Resources05.13 Population HousingSection 6: AlternativesSection 7: Effects FoundSection 8: Mitigation MeasuresSection 9: Level of SignificanceSection 10: Organizations ConsultedBibliographyMitigated Monitoring

13 Comments and Responses

Part 1Part 2

14 Appendices

Part 1Part 2Part 3Part 4Part 5Part 614.01 Initial Study and NOP14.02 NOP Responses14.03 Buildout Reduction

Task 3:  Final Draft Recycled Water Distribution System Plan

Table of ContentsExecutive SummarySection 1: IntroductionSection 2: Recycled Water Supply and Demand ProjectionsSection 3: Regulatory RequirementsSection 4: Treatment ProcessingSection 5: Development of Recycled Water SystemSection 6: Results of Recycled Water Systems AnalysesSection 7: Recommended Recycled Water System Section 8: Recommended Implementation PlanAppendix A: ECS Irrigation SystemAppendix B: Summary of Water Demand DataAppendix C: Summary of Pipeline Sizes and LengthsAppendix D: Model ResultsAppendix E: Estimated Proposed Pipeline Costs

Task 3:  Final Draft Potable Water System Distribution Analysis

Table of ContentsExecutive SummarySection 1: IntroductionSection 2: Study Area and Existing Water SystemSection 3: Water Demand ProjectionsSection 4: Development of Water System ModelSection 5: Results of Water System AnalysesSection 6: Recommmended Water System ImprovementsAppendix AAppendix BAppendix CAppendix DAppendix EAppendix FAppendix GAppendix H

Task 4:  Final Report - Assessment of Long-Term Water Supply Alternatives

Table of ContentsExecutive SummarySection 1: IntroductionSection 2: Water Supply RequirementsSection 3: Water Quality RequirementsSection 4: Potable Water Supply AlternativesSection 5: Seasonal Storage and Conjunctive Use AlternativesSection 6: Overview of Relevant Treatment TechnologiesSection 7: Evaluation Criteria for Water Supply AlternatesSection 8: Detailed Evaluation of Selected AlternativesSection 9: Recommended PlanAppendices
Join our mailing list