Design & Engineering Services for the Water and Wastewater Pipeline Replacement ProjectProposal Deadline Extended to April 4th, 2023
Zone 2 to Zone 7 Santa Rosa Bridge Water Line Replacement ProjectThe Cambria Community Services District is requesting quotes from licensed contractors for installation of a new 12-inch ductile iron pipe across existing steel bridge; tie-in to existing water lines; removal of tree; and replacement of south concrete approach. The completed project shall result in a fully functional permanent water line.
Instream Flow Study ProjectThe Cambria Community Services District (“CCSD”) is requesting Statements of Qualifications (“SOQ”) and Proposals to develop an Instream Flow Study Plan (IFSP) and execute the study within the Lower San Simeon Creek Watershed. The main goal of this IFSP shall be to provide a collaborative work plan to guide the collection and analysis of high-quality science that is robust, credible, transparent…